ADN 2

Industrial Development designed to house AAA companies, with world-class infrastructure, which has abundant workforce plus a great location, due to its proximity to the U.S. border.

Available hectares 249.18 Has Address Autopista Monterrey – Laredo km 30, cruz con Carretera Ciénega de Flores – Salinas Victoria, Ciénega de Flores, N.L. Land size 264.84 Has

Available Hectares:

249.9

Infrastructure

Well water

Well water service provided directly from the water well. Existing infrastructure already in operation. Well water can be used for production and offices services, is not for human consumption.

Sanitary sewage

Sanitary sewage service provided by a Biological Treatment Plant installed inside the Industrial Park.

Fiber optics

Fiber Optic infrastructure (piping and fibre optic), operated by NH Solutions (Neutral Host) This infrastructure is prepared for all Carriers, the Carrier selected by Client will execute a contract with NH Solutions.

Mid tension

Gas infrastructure already in operation on our Park. This services is provided by Compañía Mexicana de Gas and is considered for Manufacturing Companies.

Treated water

Our Park has Treated Water Service, is only for Industrial Use. This service is provided by Servicios de Agua y Drenaje de Monterrey, I.P.D. (Estate Office that regulates potable water and sanitary sewage in Nuevo León).

Natural gas

Gas infrastructure already in operation on our Park. This services is provided by Compañía Mexicana de Gas and is considered for Manufacturing Companies.

Security

All our parks have controlled access and 24-hour security guards. Security monitoring.